Serving Staten Island Since 2014
New concrete driveways poured to survive Staten Island winters, not crack through them. NDCCNY has poured and replaced concrete driveways across Staten Island since 2014. A driveway is not just a slab. It is a compacted sub-base, steel reinforcement, control joints, and a mix rated for our winters, and our own crew handles the whole pour.
We are a licensed and insured concrete contractor working out of Bulls Head in central Staten Island. Our own crew handles the whole pour, from the compacted sub-base and reinforcement to the finish and the control joints. You get a free on-site assessment, a written estimate within 24 hours, and work we stand behind. NYC Home Improvement Contractor license #2127843-DCWP.
Compacted sub-base, steel reinforcement, control joints, and an air-entrained mix, so your driveway handles car weight and freeze-thaw without cracking.
We use the right thickness, reinforcement, and concrete mix for Staten Island winters, not a thin slab that cracks the first hard freeze.
We check the grade, the drainage, and the existing surface, then give you a written estimate within 24 hours. No obligation.
NYC Home Improvement Contractor #2127843-DCWP, fully insured, and we handle the DOT apron permit when your job needs one.
OUR CONCRETE DRIVEWAY SERVICES
We pour new concrete driveways, replace cracked or sunken ones, repair cracks and crumbling edges, install stamped and decorative concrete, and handle driveway aprons and curb cuts, including the NYC DOT permit when one is needed.
Why Choose NDCCNY for Concrete Driveway
Concrete driveways fail for a small number of reasons, and every one is preventable at pour time. The slab is only as stable as the sub-base under it. A residential driveway should be at least four inches thick, and more where heavier vehicles park. Rebar or wire mesh holds it together, control joints force cracks into straight planned lines, and an air-entrained mix stands up to freeze-thaw. Get those right and Staten Island winters stop being a problem.
Get your free concrete driveway estimate. Call (347) 335-5005, message us on WhatsApp, or request an estimate online. We respond within 24 hours and there is no obligation. Licensed NYC Home Improvement Contractor #2127843-DCWP. Fully insured. Serving Staten Island since 2014.
TESTIMONIAL










We pour concrete driveways all over Staten Island, from Bulls Head and West Brighton down to New Dorp, Great Kills and Tottenville. If your street is not on the list below, call anyway. There is a good chance we have already poured a driveway a few blocks from you.
On the North Shore we are regularly in St. George, New Brighton, West Brighton, Livingston, Stapleton, Clifton and Rosebank. Mid-Island jobs take us to Bulls Head, Willowbrook, Todt Hill, Grasmere, New Springville and Castleton Corners. On the South Shore we work in New Dorp, Oakwood, Great Kills, Eltingville, Annadale, Tottenville and Charleston.
We also pour driveways in Bay Ridge, Bensonhurst and Dyker Heights, and take on select jobs in Bayonne, New Jersey.
We do not post one flat number because no two driveways start from the same place. These are the ranges we have actually been quoting Staten Island homeowners this year.
| Driveway type | Typical size | 2026 price range |
|---|---|---|
| Standard broom-finish concrete, tear-out and repour | 400 - 600 sq ft | $6,500 - $12,500 |
| Standard broom-finish concrete, new install on prepped ground | 400 - 600 sq ft | $5,000 - $9,500 |
| Stamped colored concrete driveway | 400 - 600 sq ft | $10,000 - $18,500 |
| Exposed aggregate concrete | 400 - 600 sq ft | $8,000 - $15,000 |
| Concrete apron replacement, DOT permitted | 100 - 200 sq ft | $2,800 - $5,500 |
| Sectional repair | per panel | $800 - $1,800 |
What moves the price the most is what is already there. Tearing out an old driveway costs more than pouring on prepped ground. Clay soil, drainage work and DOT curb permits add to the number too, along with your choice of reinforcement and finish. The only way to get a real figure is a site visit, and that visit is free.
| Phase | Duration |
|---|---|
| Site visit and written proposal | 24 - 72 hours |
| DOT permit, if apron work is involved | 1 - 3 weeks |
| Demo of existing surface | 1 day |
| Sub-base prep and form setting | 1 day |
| Pour and finish | 1 day |
| Initial cure, no foot traffic | 24 hours |
| Full cure before vehicles | 7 days |
| Full design strength | 28 days |
A standard 500 square foot driveway with no DOT permit needed usually runs ten to fourteen days from signed contract to backing your car out, weather permitting. We hold off pouring when overnight temperatures drop below 40 degrees unless we are using heated blankets and cold-weather admixtures.
Still deciding between concrete and pavers? Our paver installation crew can walk you through both. If the DOT apron or sidewalk in front of your house needs work too, we handle that through our sidewalk and apron service, and if your steps or stoop need attention while the crew is already on site, ask about masonry repairs at the same time.
WhatsApp us